亚洲国产精品网站在线播放-亚洲国产精品网站久久-亚洲国产精品婷婷久久久久-亚洲国产精品婷婷久久-亚洲国产精品特色大片观看完整版-亚洲国产精品特色大片观看

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 成人精品线观看 | 亚洲av永久精品放毛片小说 | 精品成人一区二区三区电影 | av无码精品久久久久精品免费 | 国产va免费精品高清在线观看综合网站gay麻豆 国产va免费视频一区二区三区 | 成人午夜精品无码区久久漫画日本 | 久久久精品2019中文字幕之3 | 日韩人妻少妇精品无码专区 | 精品深夜AV无码一区二区 | 亚洲在线2024最新无码 | 色窝窝免费播放视频在线 | 久久久久无码国产精品一级 | 国产1卡二卡3| 麻豆最新国产剧情AV原创免费 | 码A片国产精品18久久久... | 激激婷婷综合五 | 日本vpswindows美国 | 欧美日韩精品视频二区 | 国产精品黄色一区二区三区 | 中文文字幕文字幕亚洲色 | 亚洲国产成人久久精品影视 | 人妻无码不卡免费视频 | 国产麻豆精品一区二区 | AV 无码 高潮 在线网站 | 国产精品伦子一区二区三区 | 久久99久久无码毛片一区二区 | a级毛片高清 | 精品夜夜澡人妻无码AV | 韩国理仑片色情在线观电影 | 久久久久久亚洲av无码专区 | 久久久国产精品ⅴa麻豆 | av撸色 | 欧美日韩国产一区二区三区精品 | 丰满少妇女人a毛片视频 | 久久天堂一区二区三区 | 国产成人久久精品流白浆动态 | 久久久久人妻一区二区三区vr | 国产欧美一区二区三区高清视频 | 国产精品成人va在线播放 | 精品无码青青草原 | 亚洲另类自拍丝袜第1页 |